Quote for DD101 LONG LEAD with NSN 5910-00-678-8157 by Crl Components Inc (CAGE Code 71590)

Part Number:  DD101 LONG LEAD
Manufacturer:  crl components inc
CAGE Code:  71590
INC Code:  00007
Country:  USA
NCB Code:  00
Qty Available:  2951
Last Updated:  05-26-2025

We’re pleased to inform you that NSN part number DD101 LONG LEAD is now available in our ready-to-ship inventory. NSN part number DD101 LONG LEAD is a Capacitor Fixed Ceramic Dielectr with NSN 5910006788157 and manufactured by Crl Components Inc (CAGE Code 71590). We can get you one of the fastest and most competitive quotes on the market for NSN part number DD101 LONG LEAD in just 15 minutes. Are you interested? All you have to do is fill out the Request for Quote (RFQ) provided here.

As you fill out the RFQ, make sure that all fields, especially the asterisk-marked (*) ones like Need Parts By and Quantity (ea), are completely filled out. We will be using your response to these fields in order to understand your requirements and calculate your RFQ accordingly.

Note : We Will Not Share Your Information To Any Third Parties.

Please fill out below form for DD101 LONG LEAD

Contact Information

“*” Required Fields Are Compulsory
   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/customer-terms-and-conditions/ . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.

ASAP Supply Chain, owned and operated by ASAP Semiconductor, is a leading distributor of Crl Components Inc NSN parts and accessories in the United States. We have an inventory of more than 2 billion parts, new and obsolete, and shipping centers all across the United States, allowing us to get our customers the parts they need as soon as they need them. Our shipping center is located in Anaheim, California.

National Stock Numbers, or NSNs, are 13-digit serials assigned to all items that bought, stocked, and issued via the federal supply chain by the Defense Logistics Agency (DLA). Are you interested in learning more about NSN 5910-00-678-8157 or NSNs in general? Feel free to call us at our toll-free number, +1 (714) 705-4780, or email us at sales@asap-supplychain.com. And for a faster and more convenient purchasing solution, check out the ASAP Semiconductor App on Google Play or the App Store.

NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100067881570P
CIICHCCESDPMICCriticalityENAC
UA0
Part NumberISCRNVCRNCCHCCMSDSSADC
804103-101325

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES,RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1.500 INCHES MINIMUM
ABPMBODY DIAMETER0.290 INCHES MAXIMUM
ADAQBODY LENGTH0.156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0.250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE S)
AGAVEND ITEM IDENTIFICATIONMISSILE,AI-TO-AIR,PHOEBNIX AIM-54) TELETYPE,MODEL 28 TEST CONSOLES,MINI-SACE ENGINE,AIRCRAFT TF33-PW-102 C-135E,EC-135H/K/P) MISSILE,AIR-TO-AIR,SPARROW AIM-7) SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE SUPPORT EQUIPMENT,B
CQBQCAPACITANCE VALUE PER SECTION100.000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-56.0 TO 22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000.0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000.0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

Contact Us by Email

Industry's Fastest RFQ Turnaround. Get Your Parts Quote Now.

Email Your Requirement at:
sales@asap-supplychain.com

We are proud to supply every branch of the United States military

Company Statistics

250+

Million
Parts Sold

80+

Million
Parts Avalilable

55+

Thousand
Happy Customers

Complete Aerospace and NSN Parts Purchasing Platform

AS9120B and ISO 9001:2015

Aviation Suppliers Association Member

FAA AC 0056B Accredited

AS 6081:2012 Certification

ESD S20.20-2014 Certification

bottom to top