We’re pleased to inform you that NSN part number CK-104 LONG LEAD is now available in our ready-to-ship inventory. NSN part number CK-104 LONG LEAD is a Capacitor Fixed Ceramic Dielectr with NSN 5910001135499 and manufactured by Crl Components Inc (CAGE Code 71590). We can get you one of the fastest and most competitive quotes on the market for NSN part number CK-104 LONG LEAD in just 15 minutes. Are you interested? All you have to do is fill out the Request for Quote (RFQ) provided here.
As you fill out the RFQ, make sure that all fields, especially the asterisk-marked (*) ones like Need Parts By and Quantity (ea), are completely filled out. We will be using your response to these fields in order to understand your requirements and calculate your RFQ accordingly.
Note : We Will Not Share Your Information To Any Third Parties.
ASAP Supply Chain, owned and operated by ASAP Semiconductor, is a leading distributor of Crl Components Inc NSN parts and accessories in the United States. We have an inventory of more than 2 billion parts, new and obsolete, and shipping centers all across the United States, allowing us to get our customers the parts they need as soon as they need them. Our shipping center is located in Anaheim, California.
National Stock Numbers, or NSNs, are 13-digit serials assigned to all items that bought, stocked, and issued via the federal supply chain by the Defense Logistics Agency (DLA). Are you interested in learning more about NSN 5910-00-113-5499 or NSNs in general? Feel free to call us at our toll-free number, +1 (714) 705-4780, or email us at sales@asap-supplychain.com. And for a faster and more convenient purchasing solution, check out the ASAP Semiconductor App on Google Play or the App Store.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
A41-048 | E | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S) |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Industry's Fastest RFQ Turnaround. Get Your Parts Quote Now.
Email Your Requirement at:
sales@asap-supplychain.com
Million
Parts Sold
Million
Parts Avalilable
Thousand
Happy Customers
![]() |
AS9120B and ISO 9001:2015 |
![]() |
Aviation Suppliers Association Member |
![]() |
FAA AC 0056B Accredited |
![]() |
AS 6081:2012 Certification |
![]() |
ESD S20.20-2014 Certification |